Añazgo Barrantes, Francisco Jesús
Cargando...
Nombre preferido
Añazgo Barrantes, Francisco Jesús
Afiliación principal
Correo electrónico
francisco.anazgo@upeu.edu.pe
ORCID
ID de autor de Scopus
4 resultados
Mostrando 1 - 4 de 4
- Algunas métricas están bloqueadas por suconfiguración de consentimiento
Item type:Publicación, HIV & Hepatitis in the Americas 28–30 April 2016, Mexico City, Mexico(2016-04-28); ;Kenneth Mayer ;Omar Sued ;Néstor SosaRicardo Sobhie Diazand creative negotiations. Eradication is possible. It is up to us to make it so.Citas (OpenAlex): 0 - Algunas métricas están bloqueadas por suconfiguración de consentimiento
Item type:Patente, SISTEMA DE PUESTA A TIERRA CON MECANISMO DE REHIDRATACIÓN Y ELECTRODO AUXILIAR(Instituto Nacional de Defensa de la Competencia y de la Proteccion de la Propiedad Intelectual, 2024-09-23)metric-badges.view 7 - Algunas métricas están bloqueadas por suconfiguración de consentimiento
Item type:Patente, SISTEMA DE PUESTA A TIERRA DE FÁCIL MANTENIMIENTO(Instituto Nacional de Defensa de la Competencia y de la Proteccion de la Propiedad Intelectual, 2023-02-15)metric-badges.view 3 - Algunas métricas están bloqueadas por suconfiguración de consentimiento
Item type:Publicación, Management Model to Optimize the Drying Process of 60 Kv Voltage Transformers(2022-01-01); ;Pedro Sanchez-Huapaya ;Gabriel Tirado-Mendoza ;Jesus Vílchez-SandovalCarlos CanalesThis research aims to develop a management model for the maintenance of 60Kv voltage transformers considering as phases the good practices of the PMBOK regarding costs and times. The problem observed in this type of process occurs in the drying of the transformer, since it is one of the activities that consumes the most time during maintenance. For this, a management model was developed that optimizes the transformer drying process; which allows maintenance to be carried out within the factory facilities; which was achieved with new procedures to eliminate the humidity contained in the insulating parts of the transformer based on the optimization of the physical-chemical process of the transformer oil, obtaining as a result a reduction of the total maintenance time of 13 days, guaranteeing the optimal operation of the transformer and the reduction of operating costs.Citas (OpenAlex): 0metric-badges.view 1